Title:

Production Route Sheet Setup

Products: Paramo WRC
Last Updated: 10 April 2015

Route Sheets describe the sequence of steps required to 'manufacture' an item. Route sheets provide better control over the manufacturing process, as well as more accurate costing and transaction logging.The cycle time and the program name can be specified. Other costs are inherited from the work centre.

A process route sheet can be linked to one or more item numbers. When an order is created for an item,  the route sheet is used to load work centres. To unload a process route from an order, click on the UnLoad button.


Route Sheet Setup

Work Centres Process Routes Update